Organization Structure
Project |
Total Installed Capacity (10,000 Kilowatts) |
Shareholding Ratio (100%) |
Installed Capacity on an Equity Basis (10,000 Kilowatts) |
Yangshupu Power Plant |
0.00 |
100.00% |
0.00 |
Qujing Thermal Power Plant |
60.00 |
100.00% |
60.00 |
Minghang Power Plant |
0.00 |
100.00% |
0.00 |
Waigaoqiao Power |
128.00 |
51.00% |
65.28 |
Waigaoqiao II Power |
180.00 |
20.00% |
36.00 |
Waigaoqiao III Power |
200.00 |
30.00% |
60.00 |
Wujing Power |
60.00 |
50.00% |
30.00 |
Wujing II Power |
120.00 |
49.00% |
58.80 |
Caojing Thermal Power |
65.80 |
36.00% |
23.69 |
Tianji Power of Huaihu Coal Power |
126.00 |
50.00% |
63.00 |
Kanshan Power |
120.00 |
55.00% |
66.00 |
Wangting Gas Turbine Power |
78.00 |
45.00% |
35.10 |
Zhenhai Gas Turbine Power |
78.92 |
37.50% |
29.60 |
Jiangsu Baling |
3.00 |
15.00% |
0.45 |
Tiantai |
1.09 |
51.00% |
0.56 |
Shanghai Electric Power-Caojing Power |
200.00 |
65.00% |
130.00 |
Lingang Gas Turbine Power |
164.60 |
35.00% |
57.61 |
Suqian Solar Power |
0.89 |
51.00% |
0.45 |
Total |
0.45 |
- |
716.53 |
Page