Organization Structure

  

Project

Total Installed Capacity (10,000 Kilowatts)

Shareholding Ratio (100%)

Installed Capacity on an Equity Basis (10,000 Kilowatts)

Yangshupu Power Plant

 0.00

100.00%

0.00

Qujing Thermal Power Plant

 60.00

 100.00%

 60.00

Minghang Power Plant

 0.00

 100.00%

 0.00

Waigaoqiao Power

 128.00

 51.00%

65.28

Waigaoqiao II Power

180.00

20.00%

 36.00

Waigaoqiao III Power

 200.00

 30.00%

60.00

Wujing Power

 60.00

 50.00%

30.00

Wujing II Power

 120.00

 49.00%

 58.80

Caojing Thermal Power

65.80

36.00%

23.69

Tianji Power of Huaihu Coal Power

 126.00

50.00%

63.00

Kanshan Power

 120.00

 55.00%

66.00

Wangting Gas Turbine Power

 78.00

 45.00%

 35.10

Zhenhai Gas Turbine Power

 78.92

37.50%

 29.60

Jiangsu Baling

 3.00

 15.00%

 0.45

Tiantai Mountain Wind Power

 1.09

 51.00%

 0.56

Shanghai Electric Power-Caojing Power

 200.00

 65.00%

 130.00

Lingang Gas Turbine Power

 164.60

35.00%

57.61

Suqian Solar Power

 0.89

51.00%

 0.45

Total

 0.45

 716.53

Page